Project Description

Jumper Spool Deployment Frame. Large scale frame used to transport the fragile jumper spools from shore base to sea bed.

Project Challenges

A challenging fitting and welding project with TKY joint configurations with partial and full penetration welding.

The frame is 6m x 6m x 20m long. Handling and rotating the frame such that the welding could be executed in the flat position was challenging. The high quality surface preparation and coating was executed to exacting standards.